Friday, December 9, 2011

We returned from holidays....



We got back from 10 days of holidays and only the portico was done...


And one side of our fence...


Lets hope more gets done this week as the painting should be starting.

Cabinetry

Ensuite


Kitchen
(Mind you it has to be moved 150 mm to the left as measurements were incorrect)





Bathroom


Looking out front main bedroom windows





Jesses Favourite room ( The Laundry)

The Kitchen again from another angle. At the moment it is sticking out in the hallway but will be moved.

These photos were taken on the 23rd of Nov as I accidentally posted them on a different blog..


Wednesday, November 9, 2011

Plaster Faster!

The plaster finally started! We have been waiting for so long!

Jesse in his garage


Having a shower :)


The entrance to the main room. The pipes and wires for the island bench are coming up from the floor.


Looking into the toilet and bathroom in the back hallway.



Main bedroom


The rumpus room.



Our MASSIVE front door!


Looking from bedroom 2 into the retreat and down the hallway to the bedrooms.


The main kitchen dining and lounge area including a proud Jesse!


Entranceway



Wednesday, October 26, 2011

Nothing much at all...

As you can see bricks totally different colour to rest of the house :/ This will hopefully be sorted soon!



So nothing much at all has happened but here are some shots from around the house. We have discovered our house is bricked in the wrong colour with the right colour brick only on parts of the front and the alfresco area columns... Other little problems inside have also been getting fixed. Plasterers are meant to be starting today and ill post pics up if anything happens.


Monday, September 19, 2011

Pillars all finished being bricked.


Front of House ALLLL DONE!

Thursday, September 15, 2011

Front of House

At last we have a front on our house, really taking shape now :)

Thursday, September 8, 2011

BRICKIES!

The Outdoor Area: The pillars will eventually be bricked.



Starting on the back wall



Outdoor Area



North Side

Tuesday, August 16, 2011

Roof Tiles and Front Door!

The huge front door finally went in. Although its only temporary and will get replaced with the real one later on :)


Roof tiles getting laid!






Thursday, August 4, 2011

It has been wrapped! Wow can actually see the size of the rooms!
It surprisingly looks bigger with something on the walls.

The lounge looking into the rumpus room.



Our Pool in our outdoor area :)






Jumping over the island bench



The kitchen and dining area.


Kitchen, Lounge and Outdoor Area.

Monday, August 1, 2011

Windows!!!!!!!




Rumpus Room



Dining Room/ Kitchen




Front of the house


The Windows got put in last week! Keep on rolling! :)

Thursday, July 21, 2011

Roof Trusses up and Frames Delivered!


We have a roof! Now this is getting extra exciting! It's actually starting to look like a house!
Lots of bracing boards have been put on around the house. The frames and trusses took around 3 days to put up!






These are our gutters and faciers. These are a charcol colour which look great starting to see some of our choices coming through!!!

Thursday, July 14, 2011

Frames


Frames are finally up after a few weeks of nothing. Generator had to be used as Tru Energy had a mix up with processing our power so it still hasn't been turned on.




This is a shot of the large window in the main bedroom and two smaller windows in the protruding wall.










All the walls except the garage!



















Frames all layed out.














All of the frames up you can even walk in the door!





























Cant wait for the next update the windows and roof trusses!!!